AWCO was awarded a project to upgrade the chilled water loop in the bottom of a major hall on campus.

The project required the demolition of old equipment and piping, removal and safe disposal of glycol, installation of a new Grundfos pump set and Alfa Laval heat exchanger, new controls and piping, pressure test, and lastly insulation.

The project spanned over many months and was completed before the demand for chilled water on campus.